KRASNOGORSK

The entire embankment with an area of 12.5 hectares is divided into five main recreational zones, which will be implemented in stages (partly due to the need to lay a water collector).

The recreation area with canopies is under construction now. It’s located between residential buildings. Landscaping, installation of street furniture and sheds are carried out here. The area around the Nikolsky Temple» is at the stage of active construction.

he next stage is the Lower Embankment, with view terraces, deck chairs, direct access to the water, and a jogging track with a special coating.

The laying of the collector is almost finished. Preparatory works are taking place along the shore, elevators are being installed for people with disabilities. Two types of zones are situated between residential buildings. An active area contains unusual children’s and sports grounds, as well as restfull zone is focusing on nature and landscaping. All sections of the embankment will be connected by jogging and cycling paths, which will offer a picturesque view of the river. The project was created through active discussion with the residents of the area, taking into account their desires and preferences.

Place
Krasnogorsk
Square
4,2 Hа
Project team
Ivan Okhapkin
Tatyana Kozlova
Ksenia Shcherbina
Alexandra Sinitsina
Konstantin Pastukhov
Angelina Vasnetsova
Anna Geraymovich
Anna Filippova
Alexandra Terentyeva
Nikita Chikin
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
KRASNOGORSK
Next project